500kV Line 5A1;5A2
Overview
500kV Line 5A1;5A2 is a 500 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 138 km long. It is located at about 33.375° S, 150.919° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- TransGrid
- Voltage
- 500 kV
- Mapped length
- 138 km
- Country
- Christmas Island
- Coordinates
- 33.375° S, 150.919° E
- Reference
- 5A1;5A2
- Layer
- 500kV Lines
- Asset ID
- 19326669
More Attributes
- Cables
- 6
- Circuits
- 2
- Frequency
- 50
- Power
- line
Nearby Lines
- 500kV Line59 km
- 500kV Line59 km
- 500kV Line65 km
- 500kV Line65 km
- 500kV Line108 km