Network Map
Loading the live map around 500kV Line 5A2…

500kV Line 5A2

Line500 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

500kV Line 5A2 is a 500 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 2.5 km long. It is located at about 33.056° S, 151.503° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
TransGrid
Voltage
500 kV
Mapped length
2.5 km
Country
Christmas Island
Coordinates
33.056° S, 151.503° E
Reference
5A2
Layer
500kV Lines
Asset ID
19326666

More Attributes

Cables
3
Power
line

Nearby Lines