Network Map
Loading the live map around 330kV Line 25;92…

330kV Line 25;92

Line330 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

330kV Line 25;92 is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 13 km long. It is located at about 33.102° S, 151.498° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
TransGrid
Voltage
330 kV
Mapped length
13 km
Country
Christmas Island
Coordinates
33.102° S, 151.498° E
Reference
25;92
Layer
330kV Lines
Asset ID
19314993

More Attributes

Cables
6
Circuits
2
Power
line

Nearby Lines