Network Map
Loading the live map around 330kV Line 93…

330kV Line 93

Line330 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

330kV Line 93 is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 249 m long. It is located at about 33.054° S, 151.493° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
TransGrid
Voltage
330 kV
Mapped length
249 m
Country
Christmas Island
Coordinates
33.054° S, 151.493° E
Reference
93
Layer
330kV Lines
Asset ID
19315485

More Attributes

Cables
3
Frequency
50
Power
line
Wires
double

Nearby Lines