Network Map
Loading the live map around IPU 60Hz FI3 (Section 20229010)…

IPU 60Hz FI3 (Section 20229010)

Line500 kVSergipe NetworkSergipe, Brazil

Start Free

Overview

IPU 60Hz FI3 (Section 20229010) is a 500 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by ITAIPU Binacional. The mapped section is about 101 m long. It is located at about 25.408° S, 54.586° W.

Key Facts

Type
Line
Network
Sergipe Network
Operator / Owner
ITAIPU Binacional
Voltage
500 kV
Mapped length
101 m
State / Province
Sergipe
Country
Brazil
Coordinates
25.408° S, 54.586° W
Layer
500kV Lines
Asset ID
20229010

More Attributes

Cables
3
Circuits
1
Frequency
60
Power
line
Wires
quad

Nearby Lines