Piquete 50 - Salta Sur
Overview
Piquete 50 - Salta Sur is a 132 kV line on the Tierra del Fuego Network network in Tierra del Fuego, Argentina. Operated by TRANSNOA S.A.. The mapped section is about 38 km long. It is located at about 24.773° S, 65.298° W.
Key Facts
- Type
- Line
- Network
- Tierra del Fuego Network
- Operator / Owner
- TRANSNOA S.A.
- Voltage
- 132 kV
- Mapped length
- 38 km
- State / Province
- Tierra del Fuego
- Country
- Argentina
- Coordinates
- 24.773° S, 65.298° W
- Layer
- 132kV Lines
- Asset ID
- 19529284
More Attributes
- Cables
- 3
- Circuits
- 1
- Power
- line
Nearby Lines
- Güemes - Salta Norte2.5 km
- Cobos - Salta Este9.3 km
- Salta Sur - Salta Norte13 km
- Salta Este - Salta Sur14 km
- 132kV Line14 km