Tap FPC - FPC 154kV C1
Overview
Tap FPC - FPC 154kV C1 is a 154 kV line on the Arica y Parinacota Network network in Arica y Parinacota, Chile. The mapped section is about 387 m long. It is located at about 36.935° S, 73.153° W.
Key Facts
- Type
- Line
- Network
- Arica y Parinacota Network
- Voltage
- 154 kV
- Mapped length
- 387 m
- State / Province
- Arica y Parinacota
- Country
- Chile
- Coordinates
- 36.935° S, 73.153° W
- Layer
- 154kV Lines
- Asset ID
- 20330410
More Attributes
- Cables
- 3
- Frequency
- 50
- Power
- line
- Wires
- single
Nearby Lines
- Hualpen - Lagunillas 154kV y 220kV7.8 km
- 154kV Line7.8 km
- 154kV Line9.5 km
- 5 (Petrodow - Tap Eka Chile 154000)19 km
- 154kV Line20 km