885, 985 (Tap Carrascal - Poste 22 110kV)
Overview
885, 985 (Tap Carrascal - Poste 22 110kV) is a 110 kV line on the Arica y Parinacota Network network in Arica y Parinacota, Chile. Technology: https://infotecnica.coordinador.cl/; operated by Enel. The mapped section is about 2.7 km long. It is located at about 33.424° S, 70.677° W.
Key Facts
- Type
- Line
- Network
- Arica y Parinacota Network
- Operator / Owner
- Enel
- Voltage
- 110 kV
- Technology
- https://infotecnica.coordinador.cl/
- Mapped length
- 2.7 km
- State / Province
- Arica y Parinacota
- Country
- Chile
- Coordinates
- 33.424° S, 70.677° W
- Reference
- 885;985
- Layer
- 110kV Lines
- Asset ID
- 20328161
More Attributes
- Cables
- 6
- Frequency
- 50
- Power
- line
- Wires
- double