Network Map
Loading the live map around 69kV Line (Section 20194486)…

69kV Line (Section 20194486)

Line69 kVSergipe NetworkSergipe, Brazil

Start Free

Overview

69kV Line (Section 20194486) is a 69 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Atlas Energia Renovável. The mapped section is about 11 km long. It is located at about 13.309° S, 43.322° W.

Key Facts

Type
Line
Network
Sergipe Network
Operator / Owner
Atlas Energia Renovável
Voltage
69 kV
Mapped length
11 km
State / Province
Sergipe
Country
Brazil
Coordinates
13.309° S, 43.322° W
Layer
69kV Lines
Asset ID
20194486

More Attributes

Cables
3
Circuits
1
Frequency
60
Power
line
Wires
single

Nearby Lines