69kV Line (Section 20189869)
Overview
69kV Line (Section 20189869) is a 69 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Energisa Acre. The mapped section is about 40 m long. It is located at about 10.011° S, 67.731° W.
Key Facts
- Type
- Line
- Network
- Sergipe Network
- Operator / Owner
- Energisa Acre
- Voltage
- 69 kV
- Mapped length
- 40 m
- State / Province
- Sergipe
- Country
- Brazil
- Coordinates
- 10.011° S, 67.731° W
- Layer
- 69kV Lines
- Asset ID
- 20189869
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Old operator
- Eletronorte
- Power
- line
- Wires
- single