Network Map
Loading the live map around 138kV Line (Section 20172676)…

138kV Line (Section 20172676)

Line138 kVSergipe NetworkSergipe, Brazil

Start Free

Overview

138kV Line (Section 20172676) is a 138 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Central Eólica de Bom Jardim da Serra. The mapped section is about 10 km long. It is located at about 28.407° S, 49.591° W.

Key Facts

Type
Line
Network
Sergipe Network
Operator / Owner
Central Eólica de Bom Jardim da Serra
Voltage
138 kV
Mapped length
10 km
State / Province
Sergipe
Country
Brazil
Coordinates
28.407° S, 49.591° W
Layer
138kV Lines
Asset ID
20172676

More Attributes

Cables
3
Circuits
1
Frequency
60
Power
line
Wires
single

Nearby Lines