138kV Line (Section 20172676)
Overview
138kV Line (Section 20172676) is a 138 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Central Eólica de Bom Jardim da Serra. The mapped section is about 10 km long. It is located at about 28.407° S, 49.591° W.
Key Facts
- Type
- Line
- Network
- Sergipe Network
- Operator / Owner
- Central Eólica de Bom Jardim da Serra
- Voltage
- 138 kV
- Mapped length
- 10 km
- State / Province
- Sergipe
- Country
- Brazil
- Coordinates
- 28.407° S, 49.591° W
- Layer
- 138kV Lines
- Asset ID
- 20172676
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line4.9 km
- 138kV Line4.9 km
- 138kV Line4.9 km
- 138kV Line4.9 km
- 138kV Line16 km