Network Map
Loading the live map around 138kV Line (Section 20172610)…

138kV Line (Section 20172610)

Line138 kVSergipe NetworkSergipe, Brazil

Start Free

Overview

138kV Line (Section 20172610) is a 138 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Energisa Rondônia. The mapped section is about 109 km long. It is located at about 11.309° S, 61.884° W.

Key Facts

Type
Line
Network
Sergipe Network
Operator / Owner
Energisa Rondônia
Voltage
138 kV
Mapped length
109 km
State / Province
Sergipe
Country
Brazil
Coordinates
11.309° S, 61.884° W
Layer
138kV Lines
Asset ID
20172610

More Attributes

Cables
3
Circuits
1
Frequency
60
Old operator
Ceron
Power
line
Wires
single

Nearby Lines