Network Map
Loading the live map around 138kV Line (Section 20172358)…

138kV Line (Section 20172358)

Line138 kVSergipe NetworkSergipe, Brazil

Start Free

Overview

138kV Line (Section 20172358) is a 138 kV line on the Sergipe Network network in Sergipe, Brazil. Operated by Energisa Sul-Sudeste. The mapped section is about 3.9 km long. It is located at about 21.118° S, 48.985° W.

Key Facts

Type
Line
Network
Sergipe Network
Operator / Owner
Energisa Sul-Sudeste
Voltage
138 kV
Mapped length
3.9 km
State / Province
Sergipe
Country
Brazil
Coordinates
21.118° S, 48.985° W
Layer
138kV Lines
Asset ID
20172358

More Attributes

Cables
3
Circuits
1
Frequency
60
Old operator
CNEE
Power
line
Wires
single

Nearby Lines