132kV Line (Section 19534321)
Overview
132kV Line (Section 19534321) is a 132 kV line on the Tierra del Fuego Network network in Tierra del Fuego, Argentina. Operated by Edenor. The mapped section is about 8.5 km long. It is located at about 34.489° S, 58.571° W.
Key Facts
- Type
- Line
- Network
- Tierra del Fuego Network
- Operator / Owner
- Edenor
- Voltage
- 132 kV
- Mapped length
- 8.5 km
- State / Province
- Tierra del Fuego
- Country
- Argentina
- Coordinates
- 34.489° S, 58.571° W
- Layer
- 132kV Lines
- Asset ID
- 19534321
More Attributes
- Cables
- 6
- Frequency
- 50
- Power
- line
- Wires
- single
Nearby Lines
- 132kV Line3.7 km
- 132kV Line3.8 km
- 132kV Line3.8 km
- 132kV Line3.9 km
- 132kV Line4.2 km