Transmisión AT El Chocón (Section 19505255)
Overview
Transmisión AT El Chocón (Section 19505255) is a 500 kV line on the Neuquén Network network in Neuquén, Argentina. Operated by ENEL Generación El Chocón S.A.. The mapped section is about 1.2 km long. It is located at about 39.263° S, 68.751° W.
Key Facts
- Type
- Line
- Network
- Neuquén Network
- Operator / Owner
- ENEL Generación El Chocón S.A.
- Voltage
- 500 kV
- Mapped length
- 1.2 km
- State / Province
- Neuquén
- Country
- Argentina
- Coordinates
- 39.263° S, 68.751° W
- Layer
- 500kV Lines
- Asset ID
- 19505255
More Attributes
- Cables
- 3
- Frequency
- 50
- Power
- line
- Wires
- quad
Nearby Lines
- Transmisión AT El Chocón60 m
- Transmisión AT El Chocón70 m
- 500kV Line640 m
- 500kV Line640 m
- 500kV Line650 m