201114 - HighNoon Solar
Overview
201114 - HighNoon Solar is a transmission line on the Wisconsin Power & Light Co network in Wisconsin, United States. Technology: HighNoon Solar Project. The mapped section is about 2.2 km long. It is located at about 46.182° N, 119.050° W.
Key Facts
- Type
- Transmission Line
- Network
- Wisconsin Power & Light Co
- Technology
- HighNoon Solar Project
- Mapped length
- 2.2 km
- Region
- Wisconsin
- State / Province
- Wisconsin
- Country
- United States
- Coordinates
- 46.182° N, 119.050° W
- Layer
- Transmission Lines
- Asset ID
- 25180456
More Attributes
- Managed by
- Wisconsin Public Service Commission
- Project type
- Utility-Scale Solar Energy Project
- Infrastructure type
- Transmission Line
- Layer name
- Transmission Lines
Nearby Transmission Lines
- 201116 - HighNoon Solar1.3 km
- 201110 - HighNoon Solar1.4 km
- 201109 - HighNoon Solar2.8 km
- 201112 - HighNoon Solar2.9 km
- 201111 - HighNoon Solar3.1 km