Rawhide Prairie Solar Hybrid
Overview
Rawhide Prairie Solar Hybrid is a 23 MW power station on the Highline Electric Assn network in Colorado, United States. Technology: Batteries; Solar Photovoltaic;; operated by Greenbacker Renewable Energy Corporation. It is located at about 40.858° N, 105.016° W.
Key Facts
- Type
- Power Station
- Network
- Highline Electric Assn
- Operator / Owner
- Greenbacker Renewable Energy Corporation
- Capacity
- 23 MW
- Technology
- Batteries; Solar Photovoltaic;
- Region
- Colorado
- State / Province
- Colorado
- Country
- United States
- Coordinates
- 40.858° N, 105.016° W
- Layer
- Power Stations
- Asset ID
- 38129826
More Attributes
- Plant Name
- Rawhide Prairie Solar Hybrid
- City
- Wellington
- County
- Larimer
- Primary Energy Source
- solar
- Energy Sources
- Battery = 1 MW, Solar = 22 MW
- Net Summer Capacity (MW)
- 23
- EIA Plant ID
- 63722
- Sector
- IPP Non-CHP
Nearby Power Stations
- Rawhide580 m
- Bison Solar LLC750 m
- ECA CO Greeley49 km
- BecLee Solar CSG53 km
- USS Cogburn Solar LLC (CSG)56 km