Palmer Solar
Overview
Palmer Solar is a 60 MW power station on the Highline Electric Assn network in Colorado, United States. Technology: Solar Photovoltaic; operated by Duke Energy Renewables Services. It is located at about 38.630° N, 104.653° W.
Key Facts
- Type
- Power Station
- Network
- Highline Electric Assn
- Operator / Owner
- Duke Energy Renewables Services
- Capacity
- 60 MW
- Technology
- Solar Photovoltaic
- Region
- Colorado
- State / Province
- Colorado
- Country
- United States
- Coordinates
- 38.630° N, 104.653° W
- Layer
- Power Stations
- Asset ID
- 38129792
More Attributes
- Plant Name
- Palmer Solar
- City
- Fountain
- County
- El Paso
- Primary Energy Source
- solar
- Energy Sources
- Solar = 60 MW
- Net Summer Capacity (MW)
- 60
- EIA Plant ID
- 62495
- Sector
- IPP Non-CHP
Nearby Power Stations
- Ray D Nixon4.6 km
- Front Range Power Plant4.7 km
- Clear Spring Ranch PV Project4.8 km
- Pike Solar Hybrid6.3 km
- Fountain Valley Power Facility8.7 km