Quarry Cable Sealing End Site
Overview
Quarry Cable Sealing End Site is a 132 kV substation on the Eskom Transmission network in South Africa. Operated by Ethekwini Electricity. It is located at about 29.868° S, 30.931° E.
Key Facts
- Type
- Substation
- Network
- Eskom Transmission
- Operator / Owner
- Ethekwini Electricity
- Voltage
- 132 kV
- Country
- South Africa
- Coordinates
- 29.868° S, 30.931° E
- Layer
- Substations
- Asset ID
- 20499192
More Attributes
- Barrier
- fence
- Frequency
- 50
- Power
- substation
- Substation
- minor_distribution
Nearby Substations
- Quarry Switchyard90 m
- Ridgeview Substation410 m
- Roberts Cable Sealing End1.2 km
- Roberts Substation1.3 km
- Bellair Switchyard3.3 km