6kV Substation GLC K1277
Overview
6kV Substation GLC K1277 is a 400 / 6 kV substation on the PSE network in Poland. Technology: UM Katowice; operated by Tauron. It is located at about 50.280° N, 19.061° E.
Key Facts
- Type
- Substation
- Network
- PSE
- Operator / Owner
- Tauron
- Voltage
- 400 / 6 kV
- Technology
- UM Katowice
- Country
- Poland
- Coordinates
- 50.280° N, 19.061° E
- Reference
- GLC K1277
- Layer
- Substations
- Asset ID
- 20455553
More Attributes
- Building
- service
- Frequency
- 50
- Power
- substation
- Substation
- minor_distribution