Network Map
Loading the live map around 400kV Substation TR1…

400kV Substation TR1

Substation400 kVPSEPoland

Start Free

Overview

400kV Substation TR1 is a 400 kV substation on the PSE network in Poland. It is located at about 51.298° N, 22.616° E.

Key Facts

Type
Substation
Network
PSE
Voltage
400 kV
Country
Poland
Coordinates
51.298° N, 22.616° E
Reference
TR1
Layer
Substations
Asset ID
20441933

More Attributes

Location
outdoor
Power
transformer
Rating
250 MVA
Transformer
yes
Voltage primary
400000
Voltage secondary
110000
Voltage tertiary
30000

Nearby Substations