Network Map
Loading the live map around Posto de Seccionamento de Deocriste…

Posto de Seccionamento de Deocriste

Substation60 kVEEMMadeira

Start Free

Overview

Posto de Seccionamento de Deocriste is a 60 kV substation on the EEM network in Madeira. Operated by E-REDES. It is located at about 41.704° N, 8.717° W.

Key Facts

Type
Substation
Network
EEM
Operator / Owner
E-REDES
Voltage
60 kV
Country
Madeira
Coordinates
41.704° N, 8.717° W
Layer
Substations
Asset ID
20387207

More Attributes

Barrier
fence
Location
outdoor
Power
substation
Substation
switching

Nearby Substations