Ccas is a 20 kV substation on the Terna SpA network in Italy. Technology: extraction vectorielle v1 cadastre-dgi-fr source : Direction Générale des Impôts - Cadas. Mise à jour : 2010; operated by Enedis. It is located at about 45.862° N, 6.631° E.
Key Facts
- Type
- Substation
- Network
- Terna SpA
- Operator / Owner
- Enedis
- Voltage
- 20 kV
- Technology
- extraction vectorielle v1 cadastre-dgi-fr source : Direction Générale des Impôts - Cadas. Mise à jour : 2010
- Country
- Italy
- Coordinates
- 45.862° N, 6.631° E