SUTT 150kV PALUR-GDRJO (Section 19435814)
Overview
SUTT 150kV PALUR-GDRJO (Section 19435814) is a 150 kV line on the PLN network in Indonesia. The mapped section is about 97 m long. It is located at about 7.560° S, 110.880° E.
Key Facts
- Type
- Line
- Network
- PLN
- Voltage
- 150 kV
- Mapped length
- 97 m
- Country
- Indonesia
- Coordinates
- 7.560° S, 110.880° E
- Layer
- 150kV Lines
- Asset ID
- 19435814
More Attributes
- Cables
- 3
- Frequency
- 50
- Power
- line
Nearby Lines
- SUTT 150kV PALUR-GDRJO10 m
- 150kV Line90 m
- 150kV Line100 m
- SUTT 150kV SLBRU-PALUR130 m
- SUTT 150kV SLBRU-PALUR140 m