Moreeni sähköasema is a 110 / 20 kV substation on the Fingrid network in Finland. Technology: MML2017; operated by Elenia. It is located at about 60.961° N, 24.438° E.
Key Facts
- Type
- Substation
- Network
- Fingrid
- Operator / Owner
- Elenia
- Voltage
- 110 / 20 kV
- Technology
- MML2017
- Country
- Finland
- Coordinates
- 60.961° N, 24.438° E
- Layer
- Substations
- Asset ID
- 18911918
More Attributes
- Barrier
- fence
- Power
- substation
- Substation
- distribution