69kV Substation Subestación Lago Agrio is a 69 / 13.8 kV substation on the CELEC EP network in Ecuador. Operated by CNEL-Sucumbíos. It is located at about 0.076° N, 76.895° W.
Key Facts
- Type
- Substation
- Network
- CELEC EP
- Operator / Owner
- CNEL-Sucumbíos
- Voltage
- 69 / 13.8 kV
- Country
- Ecuador
- Coordinates
- 0.076° N, 76.895° W
- Reference
- Subestación Lago Agrio
- Layer
- Substations
- Asset ID
- 18902085
More Attributes
- Frequency
- 60
- Location
- outdoor
- Power
- substation
- Rating
- 37,5 MVA
- Substation
- distribution