Network Map
Loading the live map around 69kV Substation Subestación Atacames…

69kV Substation Subestación Atacames

Substation69 / 13.8 kVCELEC EPEcuador

Start Free

Overview

69kV Substation Subestación Atacames is a 69 / 13.8 kV substation on the CELEC EP network in Ecuador. Operated by CNEL-Esmeraldas. It is located at about 0.870° N, 79.842° W.

Key Facts

Type
Substation
Network
CELEC EP
Operator / Owner
CNEL-Esmeraldas
Voltage
69 / 13.8 kV
Commissioned
1986
Country
Ecuador
Coordinates
0.870° N, 79.842° W
Reference
Subestación Atacames
Layer
Substations
Asset ID
18901972

More Attributes

Frequency
60
Location
outdoor
Power
substation
Rating
16 MVA
Substation
distribution

Nearby Substations