La Avanzada
Overview
La Avanzada is a 69 / 13.8 kV substation on the CELEC EP network in Ecuador. Operated by CNEL-El Oro. It is located at about 3.521° S, 79.971° W.
Key Facts
- Type
- Substation
- Network
- CELEC EP
- Operator / Owner
- CNEL-El Oro
- Voltage
- 69 / 13.8 kV
- Country
- Ecuador
- Coordinates
- 3.521° S, 79.971° W
- Reference
- S/E 05
- Layer
- Substations
- Asset ID
- 18901847
More Attributes
- Location
- outdoor
- Power
- substation
- Rating
- 5 MVA
- Substation
- distribution
Nearby Substations
- Santa Rosa8.1 km
- Arenillas11 km
- Subestación Saracay19 km
- Subestación El Cambio26 km
- Huaquillas27 km