CENTRO SUR
Overview
CENTRO SUR is a 69 / 22 kV substation on the CELEC EP network in Ecuador. Operated by E.E. Centro Sur. It is located at about 2.744° S, 78.857° W.
Key Facts
- Type
- Substation
- Network
- CELEC EP
- Operator / Owner
- E.E. Centro Sur
- Voltage
- 69 / 22 kV
- Country
- Ecuador
- Coordinates
- 2.744° S, 78.857° W
- Reference
- Subestación Guablincay
- Layer
- Substations
- Asset ID
- 18901801
More Attributes
- Power
- substation
- Rating
- 12,5 MVA
- Substation
- distribution
Nearby Substations
- 69kV Substation560 m
- S/E Azogues 21.5 km
- Subestación de Tabacay2.7 km
- Subestación Taday 230 Kv14 km
- 69kV Substation17 km