33kV Line 719
Overview
33kV Line 719 is a 33 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by Essential Energy. The mapped section is about 1.1 km long. It is located at about 31.466° S, 152.899° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- Essential Energy
- Voltage
- 33 kV
- Mapped length
- 1.1 km
- Country
- Christmas Island
- Coordinates
- 31.466° S, 152.899° E
- Reference
- 719
- Layer
- 33kV Lines
- Asset ID
- 19327577
More Attributes
- Cables
- 3
- Frequency
- 50
- Power
- line