33kV Line 7R7
Overview
33kV Line 7R7 is a 33 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by Essential Energy. The mapped section is about 19 km long. It is located at about 31.139° S, 152.900° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- Essential Energy
- Voltage
- 33 kV
- Mapped length
- 19 km
- Country
- Christmas Island
- Coordinates
- 31.139° S, 152.900° E
- Reference
- 7R7
- Layer
- 33kV Lines
- Asset ID
- 19327214
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 50
- Power
- line
- Wires
- single