SunCoast Power Project (Section 19324327)
Overview
SunCoast Power Project (Section 19324327) is a 132 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by Energex. The mapped section is about 302 m long. It is located at about 26.717° S, 152.974° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- Energex
- Voltage
- 132 kV
- Commissioned
- 2020/07/09
- Mapped length
- 302 m
- Country
- Christmas Island
- Coordinates
- 26.717° S, 152.974° E
- Layer
- 132kV Lines
- Asset ID
- 19324327
More Attributes
- Power
- line
Nearby Lines
- 132kV Line10 m
- SunCoast Power Project320 m
- 132kV Line320 m
- SunCoast Power Project1.9 km
- SunCoast Power Project3.8 km