SunCoast Power Project (Section 19324319)
Overview
SunCoast Power Project (Section 19324319) is a 132 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by Energex. The mapped section is about 95 m long. It is located at about 26.659° S, 153.042° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- Energex
- Voltage
- 132 kV
- Commissioned
- 2020/07/09
- Mapped length
- 95 m
- Country
- Christmas Island
- Coordinates
- 26.659° S, 153.042° E
- Layer
- 132kV Lines
- Asset ID
- 19324319
More Attributes
- Power
- line
Nearby Lines
- SunCoast Power Project170 m
- 132kV Line170 m
- SunCoast Power Project280 m
- 132kV Line280 m
- SunCoast Power Project590 m