Network Map
Loading the live map around Murray Bridge Pump 2 to 3…

Murray Bridge Pump 2 to 3

Line132 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

Murray Bridge Pump 2 to 3 is a 132 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by Electranet. The mapped section is about 19 km long. It is located at about 35.071° S, 139.114° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
Electranet
Voltage
132 kV
Mapped length
19 km
Country
Christmas Island
Coordinates
35.071° S, 139.114° E
Layer
132kV Lines
Asset ID
19322321

More Attributes

Cables
3
Power
line

Nearby Lines