Network Map
Loading the live map around 132kV Line 965…

132kV Line 965

Line132 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

132kV Line 965 is a 132 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 143 km long. It is located at about 30.747° S, 152.311° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
TransGrid
Voltage
132 kV
Mapped length
143 km
Country
Christmas Island
Coordinates
30.747° S, 152.311° E
Reference
965
Layer
132kV Lines
Asset ID
19319813

More Attributes

Cables
3
Circuits
1
Frequency
50
Power
line
Wires
single

Nearby Lines