EnergyConnect-West (Section 19315568)
Overview
EnergyConnect-West (Section 19315568) is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 39 km long. It is located at about 33.965° S, 142.118° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- TransGrid
- Voltage
- 330 kV
- Mapped length
- 39 km
- Country
- Christmas Island
- Coordinates
- 33.965° S, 142.118° E
- Layer
- 330kV Lines
- Asset ID
- 19315568
More Attributes
- Cables
- 6
- Circuits
- 2
- Frequency
- 50
- Power
- line
Nearby Lines
- EnergyConnect-West61 km
- EnergyConnect-West106 km
- EnergyConnect-West131 km
- EnergyConnect-West187 km
- EnergyConnect-West247 km