Network Map
Loading the live map around 330kV Line 5…

330kV Line 5

Line330 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

330kV Line 5 is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 117 km long. It is located at about 34.820° S, 149.535° E.

Key Facts

Type
Line
Network
Christmas Island Power Authority
Operator / Owner
TransGrid
Voltage
330 kV
Mapped length
117 km
Country
Christmas Island
Coordinates
34.820° S, 149.535° E
Reference
5
Layer
330kV Lines
Asset ID
19315128

More Attributes

Cables
3
Power
line

Nearby Lines