330kV Line 70;71
Overview
330kV Line 70;71 is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Operated by TransGrid. The mapped section is about 7.5 km long. It is located at about 33.389° S, 150.062° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- TransGrid
- Voltage
- 330 kV
- Mapped length
- 7.5 km
- Country
- Christmas Island
- Coordinates
- 33.389° S, 150.062° E
- Reference
- 70;71
- Layer
- 330kV Lines
- Asset ID
- 19315039
More Attributes
- Cables
- 6
- Circuits
- 2
- Power
- line
Nearby Lines
- 330kV Line2.5 km
- 330kV Line2.5 km
- 330kV Line2.5 km
- 330kV Line2.6 km
- 330kV Line2.6 km