330kV Line (Section 19315038)
Overview
330kV Line (Section 19315038) is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Technology: actmapi;nsw lpi imagery; operated by TransGrid. The mapped section is about 45 km long. It is located at about 35.065° S, 148.879° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- TransGrid
- Voltage
- 330 kV
- Technology
- actmapi;nsw lpi imagery
- Mapped length
- 45 km
- Country
- Christmas Island
- Coordinates
- 35.065° S, 148.879° E
- Layer
- 330kV Lines
- Asset ID
- 19315038
More Attributes
- Cables
- 3
- Circuits
- 1
- Power
- line
- Wires
- double
Nearby Lines
- 330kV Line20 km
- 330kV Line20 km
- 330kV Line20 km
- 330kV Line20 km
- 330kV Line20 km