330kV Line 25
Overview
330kV Line 25 is a 330 kV line on the Christmas Island Power Authority network in Christmas Island. Technology: nearmap; operated by TransGrid. The mapped section is about 403 m long. It is located at about 33.156° S, 151.515° E.
Key Facts
- Type
- Line
- Network
- Christmas Island Power Authority
- Operator / Owner
- TransGrid
- Voltage
- 330 kV
- Technology
- nearmap
- Mapped length
- 403 m
- Country
- Christmas Island
- Coordinates
- 33.156° S, 151.515° E
- Reference
- 25
- Layer
- 330kV Lines
- Asset ID
- 19314992
More Attributes
- Cables
- 3
- Frequency
- 50
- Power
- line
Nearby Lines
- 330kV Line20 m
- 330kV Line60 m
- 330kV Line1.3 km
- 330kV Line2.5 km
- 330kV Line3.6 km