Warwick East
Overview
Warwick East is a 33 / 11 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by Ergon Energy. It is located at about 28.220° S, 152.045° E.
Key Facts
- Type
- Substation
- Network
- Christmas Island Power Authority
- Operator / Owner
- Ergon Energy
- Voltage
- 33 / 11 kV
- Country
- Christmas Island
- Coordinates
- 28.220° S, 152.045° E
- Layer
- Substations
- Asset ID
- 18875194
More Attributes
- Power
- substation
Nearby Substations
- Network Substation20 m
- Network Substation20 m
- Network Substation1.1 km
- 11kV Substation2.4 km
- Warwick2.6 km