Berri Substation

Substation132 / 66 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

Berri Substation is a 132 / 66 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by Electranet. It is located at about 34.270° S, 140.598° E.

Key Facts

Type
Substation
Network
Christmas Island Power Authority
Operator / Owner
Electranet
Voltage
132 / 66 kV
Country
Christmas Island
Coordinates
34.270° S, 140.598° E
Layer
Substations