Woodend Zone Substation
Overview
Woodend Zone Substation is a 66 / 22 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by Powercor. It is located at about 37.335° S, 144.518° E.
Key Facts
- Type
- Substation
- Network
- Christmas Island Power Authority
- Operator / Owner
- Powercor
- Voltage
- 66 / 22 kV
- Country
- Christmas Island
- Coordinates
- 37.335° S, 144.518° E
- Reference
- WND
- Layer
- Substations
- Asset ID
- 18873141
More Attributes
- Location
- outdoor
- Power
- substation
- Substation
- distribution
Nearby Substations
- Gisborne Zone Substation14 km
- Sunbury Zone Substation33 km
- Network Substation34 km
- 22kV Substation55 km
- Network Substation59 km