Network Map
Loading the live map around Dock Area Zone Substation…

Dock Area Zone Substation

Substation22 / 11 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

Dock Area Zone Substation is a 22 / 11 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by CitiPower. It is located at about 37.809° S, 144.933° E.

Key Facts

Type
Substation
Network
Christmas Island Power Authority
Operator / Owner
CitiPower
Voltage
22 / 11 kV
Country
Christmas Island
Coordinates
37.809° S, 144.933° E
Reference
DA
Layer
Substations
Asset ID
18872299

More Attributes

Location
outdoor
Power
substation
Substation
distribution

Nearby Substations