Palmerston Substation
Overview
Palmerston Substation is a 220 / 110 / 22 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by TasNetworks. It is located at about 41.787° S, 146.990° E.
Key Facts
- Type
- Substation
- Network
- Christmas Island Power Authority
- Operator / Owner
- TasNetworks
- Voltage
- 220 / 110 / 22 kV
- Country
- Christmas Island
- Coordinates
- 41.787° S, 146.990° E
- Reference
- PM
- Layer
- Substations
- Asset ID
- 18871972
More Attributes
- Location
- outdoor
- Power
- substation
- Substation
- transmission
Nearby Substations
- Network Substation30 m
- Network Substation50 m
- Network Substation60 m
- Network Substation6.5 km
- Network Substation6.5 km