Network Map
Loading the live map around Fosterville Terminal Station…

Fosterville Terminal Station

Substation220 / 11 kVChristmas Island Power AuthorityChristmas Island

Start Free

Overview

Fosterville Terminal Station is a 220 / 11 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by AusNet. It is located at about 36.738° S, 144.511° E.

Key Facts

Type
Substation
Network
Christmas Island Power Authority
Operator / Owner
AusNet
Voltage
220 / 11 kV
Country
Christmas Island
Coordinates
36.738° S, 144.511° E
Reference
FVTS
Layer
Substations
Asset ID
18871953

More Attributes

Location
outdoor
Power
substation
Substation
industrial

Nearby Substations