Middleback Substation
Overview
Middleback Substation is a 132 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by ElectraNet. It is located at about 33.167° S, 137.101° E.
Key Facts
- Type
- Substation
- Network
- Christmas Island Power Authority
- Operator / Owner
- ElectraNet
- Voltage
- 132 kV
- Country
- Christmas Island
- Coordinates
- 33.167° S, 137.101° E
- Reference
- T514
- Layer
- Substations
- Asset ID
- 18871815
More Attributes
- Barrier
- fence
- Power
- substation
- Substation
- transmission
Nearby Substations
- 33kV Substation42 km
- Network Substation46 km
- 33kV Substation46 km
- Whyalla Central Connection Point46 km
- Network Substation48 km