East Ryde Transition Point
Overview
East Ryde Transition Point is a 132 kV substation on the Christmas Island Power Authority network in Christmas Island. Operated by Ausgrid. It is located at about 33.815° S, 151.141° E.
Key Facts
- Type
- Substation
- Network
- Christmas Island Power Authority
- Operator / Owner
- Ausgrid
- Voltage
- 132 kV
- Country
- Christmas Island
- Coordinates
- 33.815° S, 151.141° E
- Reference
- 7320
- Layer
- Substations
- Asset ID
- 18871414
More Attributes
- Power
- substation
- Substation
- transition