三峡至广东直流接地线
Overview
三峡至广东直流接地线 is a 35 kV line on the State Grid Corporation of China network in China. The mapped section is about 20 km long. It is located at about 30.494° N, 112.047° E.
Key Facts
- Type
- Line
- Network
- State Grid Corporation of China
- Voltage
- 35 kV
- Mapped length
- 20 km
- Country
- China
- Coordinates
- 30.494° N, 112.047° E
- Layer
- 35kV Lines
- Asset ID
- 19257505
More Attributes
- Cables
- 2
- Designation
- HVDC Three Gorges-Guangdong - electrode line
- Line
- electrode
- Power
- line