138kV Line (Section 18730084)
Overview
138kV Line (Section 18730084) is a 138 kV line on the Taesa (Transmissora Aliança de Energia Elétrica) network in Brazil. Operated by Cemig. The mapped section is about 25 km long. It is located at about 17.520° S, 44.899° W.
Key Facts
- Type
- Line
- Network
- Taesa (Transmissora Aliança de Energia Elétrica)
- Operator / Owner
- Cemig
- Voltage
- 138 kV
- Mapped length
- 25 km
- Country
- Brazil
- Coordinates
- 17.520° S, 44.899° W
- Layer
- 138kV Lines
- Asset ID
- 18730084
More Attributes
- Cables
- 3
- Circuits
- 1
- Frequency
- 60
- Power
- line
- Wires
- single
Nearby Lines
- 138kV Line13 km
- 138kV Line13 km
- 138kV Line15 km
- 138kV Line15 km
- 138kV Line15 km